First day of working on the kitchen floor is over. I always assume that a job like this is going to be harder than it should be, but I wasn't counting on it being 5 or 6 times as hard. Getting the refrigerator out, unhooking and removing the gas stove, and that enormous wood hutch of Cheri's outside on the driveway was a job all in itself.
First problem was layer after layer of flooring. 2 layers of carpet, particle board, 70s style wall paneling, linoleum, and a couple of layers of wood slats. Cutting through the floor, we nicked a water pipe. Not a big problem but we had to shut the water off outside and repair it. Tearing through the floor was long, tedious and noisy. Then put in new 6 inch sills to replace the old, rotten 4 inch sills. In the process, a toy car, a toy motorcycle rider, (without the motorcycle) and a baseball fell out of the west wall. Why it was in the wall, I can't imagine.
Then we found another water leak, 2 feet under ground. The ground was soaked, a muddy mess, and the wood nearby was saturated. The old pipe was galvanized steel, which over time had still rusted. Quite a bit of pipe had to be replaced. Done.
We have to pass through the kitchen to get to the bathroom, or pretty much anyplace else in the house but it had already been 13 hours and everybody was beat. So, we layed just enough flooring to get across to the bathroom and called it a night, with a gaping hole in 3 quarters of what used to be the kitchen floor.
Tonight, pretty much everything that was in the kitchen, the refrigerator, stove, the kitchen table and giant hutch are still sitting in the driveway. The refrigerator is still full of food so we ran an extension cord to an outlet outside. It's not supposed to rain but if it does, Cheri will panic. Tomorrow, the rest of the floor goes in, then it gets overlaid with some tough, nice looking flooring. Then all the kitchen stuff gets dragged back in and Cheri can spend the next 2 or 3 days putting all her stuff back in place. After that, I have to go work down on the Lake, which means I'll be gone before hardly any of it is done, but there will be 3 guys to finish it all up. John